{"id":115,"date":"2020-09-24T17:16:31","date_gmt":"2020-09-24T15:16:31","guid":{"rendered":"https:\/\/civil-systems.co.il\/new_civ\/?page_id=115"},"modified":"2025-02-09T21:05:18","modified_gmt":"2025-02-09T19:05:18","slug":"infrastructural-systems-coordination-2","status":"publish","type":"page","link":"https:\/\/civil-systems.co.il\/new_civ\/infrastructural-systems-coordination-2\/","title":{"rendered":"Infrastructural systems coordination"},"content":{"rendered":"\n<p>Determining the typical sections and locating the infrastructures in the road section.<\/p>\n\n\n\n<p>\ufeffCollecting plans from the various infrastructure planners \u2013 water, sewage, electricity, lighting, and communication and creating a systems coordination plan while maneuvering between the different planners.<\/p>\n\n\n\n<p>\ufeffProviding designated solutions in critical areas, in nodes, junctions, and system concentrations.<\/p>\n\n\n\n<div style=\"height:30px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<figure class=\"wp-block-image\"><img decoding=\"async\" width=\"199\" height=\"125\" src=\"https:\/\/civil-systems.co.il\/new_civ\/wp-content\/uploads\/2020\/09\/peilut2_1.jpg\" alt=\"\" class=\"wp-image-157\"\/><\/figure>\n\n\n\n<div style=\"height:30px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<figure class=\"wp-block-image\"><img decoding=\"async\" width=\"199\" height=\"112\" src=\"https:\/\/civil-systems.co.il\/new_civ\/wp-content\/uploads\/2020\/09\/peilut2_2-1.jpg\" alt=\"\" class=\"wp-image-159\"\/><\/figure>\n\n\n\n<div style=\"height:30px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Determining the typical sections and locating the infrastructures in the road section. \ufeffCollecting plans from the various infrastructure planners \u2013 water, sewage, electricity, lighting, and communication and creating a systems coordination plan while maneuvering between the different planners. \ufeffProviding designated solutions in critical areas, in nodes, junctions, and system concentrations.<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"class_list":["post-115","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/civil-systems.co.il\/new_civ\/wp-json\/wp\/v2\/pages\/115","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/civil-systems.co.il\/new_civ\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/civil-systems.co.il\/new_civ\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/civil-systems.co.il\/new_civ\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/civil-systems.co.il\/new_civ\/wp-json\/wp\/v2\/comments?post=115"}],"version-history":[{"count":5,"href":"https:\/\/civil-systems.co.il\/new_civ\/wp-json\/wp\/v2\/pages\/115\/revisions"}],"predecessor-version":[{"id":376,"href":"https:\/\/civil-systems.co.il\/new_civ\/wp-json\/wp\/v2\/pages\/115\/revisions\/376"}],"wp:attachment":[{"href":"https:\/\/civil-systems.co.il\/new_civ\/wp-json\/wp\/v2\/media?parent=115"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}