{"id":91,"date":"2020-09-24T16:03:19","date_gmt":"2020-09-24T14:03:19","guid":{"rendered":"https:\/\/civil-systems.co.il\/new_civ\/?page_id=91"},"modified":"2020-09-24T17:48:58","modified_gmt":"2020-09-24T15:48:58","slug":"technical-specifications-and-quantity-surveys","status":"publish","type":"page","link":"https:\/\/civil-systems.co.il\/new_civ\/technical-specifications-and-quantity-surveys\/","title":{"rendered":"Technical specifications and quantity surveys"},"content":{"rendered":"\n<ol class=\"wp-block-list\"><li>Bid documents, specifications, and additional contracts \u2013 determining bid strategy, editing specifications including the general section (G1), the special specification (G2) including the chapters relevant to the project, collecting and editing the system planners\u2019 chapters and integrating the contractual part according to need and to the customer\u2019s requirements.<br><br><\/li><li>Quantity surveys \u2013 conducting a quantity survey for all the works in the facility or building in the different professions.<br><br><\/li><li>Estimates \u2013 project cost estimates according to market prices.<br><br><\/li><li>Publishing the bid and initial screening for prequalification<br><br><\/li><li>Proposals evaluation<\/li><\/ol>\n","protected":false},"excerpt":{"rendered":"<p>Bid documents, specifications, and additional contracts \u2013 determining bid strategy, editing specifications including the general section (G1), the special specification (G2) including the chapters relevant to the project, collecting and editing the system planners\u2019 chapters and integrating the contractual part according to need and to the customer\u2019s requirements. Quantity surveys &hellip;<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"class_list":["post-91","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/civil-systems.co.il\/new_civ\/wp-json\/wp\/v2\/pages\/91","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/civil-systems.co.il\/new_civ\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/civil-systems.co.il\/new_civ\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/civil-systems.co.il\/new_civ\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/civil-systems.co.il\/new_civ\/wp-json\/wp\/v2\/comments?post=91"}],"version-history":[{"count":3,"href":"https:\/\/civil-systems.co.il\/new_civ\/wp-json\/wp\/v2\/pages\/91\/revisions"}],"predecessor-version":[{"id":134,"href":"https:\/\/civil-systems.co.il\/new_civ\/wp-json\/wp\/v2\/pages\/91\/revisions\/134"}],"wp:attachment":[{"href":"https:\/\/civil-systems.co.il\/new_civ\/wp-json\/wp\/v2\/media?parent=91"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}